Verifying the Installation
The solar inverter is installed correctly and securely.
The DC switches and downstream AC switch are set to OFF.
All cables are connected correctly and securely.
The installation space is proper, and the installation environment is clean and tidy.
The maintenance compartment door is closed
and the screws are secured.
Unused DC input terminals are sealed.
Unused USB ports are plugged with watertight caps.
One or two
communications cables
Three communications
cables
One communications cable
Connecting RS485 Communications Cables (4–8 mm Two-hole or Three-hole Rubber Plug)
6
Powering On the System
When LED2 is steady green (meaning that the inverter is grid-tied), do not turn on any DC
switch. Otherwise, the inverter may be damaged because the insulation resistance is not
detected.