EasyManua.ls Logo

Huawei U-SYS IAD208E - Installing Hardware

Huawei U-SYS IAD208E
41 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
User Manual
U-SYS IAD208E(M) Integrated Access Device
Chapter 2 Installing Hardware
Huawei Technologies Proprietary
2-4
Table 2-3 List of tools and meters
Tools &
Meters
Description
Fastening
tools
Cross screwdriver M3
Universal
tools
Fitter tools
Sharp-nose pliers, diagonal pliers,
pliers
Special
tools
cable peeler, crimping pliers, and wire punch-down
tool
Meters
Multimeters, 500 V megaohm meters (for measuring
the insulation resistance)
Note:
The supplier should provide the list of tools and meters, and decide
the provider of the tools and meters together with the customer.
The meters must be calibrated and proved to be qualified before
they can be used.
2.2 Installing Hardware
IAD208E(M) is a box-like device with fixed configuration.
Installation on site is very simple, and the main installation steps are
connections of cables, as shown in Table 2-4.

Related product manuals