EasyManua.ls Logo

Huawei UPS2000-G-6KRTLL - Installing a UPS

Huawei UPS2000-G-6KRTLL
18 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2
2
Installing a UPS
1. Carefully read the
UPS2000-G-6KRTLL User Manual
prior to installation to get familiar with
product information and safety precautions.
2. Use fully insulated tools during installation and operation.
3. Only engineers certified by the manufacturer or its agent are allowed to install, commission,
and maintain the UPS. Otherwise, personal injury or equipment damage may occur, and the
UPS faults caused are beyond the warranty scope of Huawei.
Rack-Mounting the UPS2000-G
Scenario
1. Reserve a space of 1 U in the middle of four batteries for routing battery power cables.
2. Reserve a space of 5 cm between the battery communications port and the cabinet for
installing a communications cable.
3. Reserve a space of 44 mm between the battery edge and the rack edge for installing
battery power cables.
4. In rack-mounted installation scenarios, the front panels of the UPS and lithium batteries
are not on the same plane.
5. The guide rails for the UPS2000-G-6KRTLL are 592.37 mm to 807.37 mm long, 30 mm
wide, and 87 mm high. The guide rails are scalable and support Huawei M-shaped cabinets.
1. Install mounting brackets on UPS.
UPS mounting ear
dimensions (unit:
mm)
All manuals and user guides at all-guides.com

Other manuals for Huawei UPS2000-G-6KRTLL

Related product manuals