Hunter e36 • Documents and Forms
2.6
____ Smoke detectors operational
____ CO detectors operational (one per cabin recommended)
____ Engine & generator room blower operational
____ Auto re suppression system operational (engine compartment)
____ Shore power cord and adapter plug operational. See manufacturer’s manual for complete details
____ 110 or 220 VAC outlets operational - Ground fault circuits functioning
____ 110 or 220 VAC inverter/battery charging systems functioning properly
____ Cockpit control systems operational
Fresh Water Systems
____ Hot water heater drains shut
____ All spigots and hose bibs shut
____ All tanks ushed clean and free of debris and antifreeze
____ Water heater tank and lines ushed of antifreeze
____ All water lines and components purged of air and checked for leaks
____ Sinks and drains checked for leaks and adequate ow
____ Cockpit shower operational
____ Fresh water lters clean
____ Tank water level indicator systems operating- labeling and tank valve selection correspond
Head and Holding Tank Systems
____ Vent clear from tank to atmosphere
____ Filled with fresh water and test pumped with macerator
____ Toilets ush to holding tanks properly
____ Waste level indicating system properly functioning
____ No leaks at any hose tting within the system
Galley Systems
____ Gas bottle lled installed and connected to regulator. Inspect Gas system for leaks after 3 minutes.
Should a leak be detected immediately close the main valve exit boat and seek professional assistance for a
thorough inspection.
____ Stove and oven operational. Refer to manufacturer’s manual for proper operation and trouble shooting.
____ Gimbal latch secure and operational
____ LPG stowage locker drain open and tank storage area free of derbies.
____ Microwave operational
____ Refrigerator operational and proper temperature attained
____ Freezer operational and proper temperature attained
____ USCG waste disposal-warning poster onboard or in owner’s package
____ Icebox drains to sump or bilge properly
____ Icebox drain plugs installed
Topside Inspection
____ Swim seats / ladders / gates operational
____ Swim seat latch operating correctly
____ Cockpit hatches operate properly (adjustments should be made with boat in water)
____ Canvas properly cleaned and installed
____ Cockpit cushions cleaned and installed
____ Lifeline ttings tight and secure