nt
r 1
• D
m
nt
n
F
rm
2.4
re
m
nar
care an
ma
ntenance c
ec
s
A qualified Technician should be used if you are not completely confident in your ability to
ake repairs or inspections
Out of Water Ins
ection
Pre-launch ins
ection
Drain plu
installed
___ Rudder swings easily
___ Rudder and post inspected for cracks and/or concealed damage (may require removing rudder
Tiller handle properl
ali
ned, fi ts securel
and operational
___ Hull freshly cleaned and waxed (free of gelcoat damage)
___ Mooring, safety lines and fenders onboard and in good condition
Boat is free of internal and external water leaks above water line
(Failure to stop water intrusion could result in permanent damage or deterioration of structural coring materials, internal wiring and cause mildew and molding)
ast Assembl
___ Review manufacturers manual for maintenance and up-keep
Spreaders securel
fastened
___ Mast and spreaders free of corrosion and stress cracks
___ Standing rigging and pins inspected for wear, tear, corrosion and cracking
Manual wind indicator installed on masthead
___ Headsail furling system installed inspected per manufacturers recommendatio
___ Running rigging inspected for wear and tea
Mast step stand-up blocks secured and operational
___ Main Sail,
ib sail inspected for wear and tear
___ Specifi ed pre-bend and diagonal tensions attained in mast. See mast owners manual
o
side Ins
ection
___ Canvas properly cleaned and installed
___ Rubrail sealed secured to hull
Load bearin
hardware securel
fastened. This includes but is not limited to chainplates, winches and handrail
___ Topside surface clean and free of gelcoat damag
___ Safety gear onboard readily available and up to date.
See Chapman’s Manual and US Coast Guard website at < www.uscg.mil >for details.
___ Boat owner’s manual onboard
___ Lower unit oil at full mark (per engine manual)
In Water Ins
ection
ockside inspection of En
ine, Pre-start sequence and operatin
s
ste
___ Review engine manual for maintenance requirements and proper starting procedur
___ Air bled from fuel lines and syste
No fuel leaks at an
fi ttin
s
___ Throttle linkages smooth and operational