Hunter 4
• Sails and Ri
in
2.
and the Mainsheet Purchase la
out
12.4 The Sails
As standard
our Hunter is equipped with a
urlin
ib
sail and a drop down main sail. The mainsail is the sail
tt
h
t
th
ft tr
k
f th
m
t
n
h
i
t
with th
main hal
ard
rom the cockpit. The
ib sail is attached to
the foresta
and like the mainsail hoisted with the
ib hal-
ard from the cockpit.
t H
nt
r
il
t
f
t
r
th
ntr
l
f th
m
t
im
ortant sail controls from the cock
it. In addition to the
main and
ib hal
ard
ou will
ind a main sheet line with
a winch at the aft ed
e of the cockpit to
ether with the
van
and or outhaul control
some optional
. The
ib is
ontrolled with the
ib sheet control lines lead back to the
ockpit comin
either side. In addition the
ib furlin
line
located to the starboard side of the cock
it allows the
sa
e and eas
un
urlin
and
urlin
in o
the
ib sail
Your main sail is pre fitted with double reefin
points
that enable
ou to reduce the sail area i
the weather
onditions demand it. As
uidance the sail area should
be reduced if the loadin
on the sails is excessive and
results in excessive heelin
that prevents
ou
rom con-
trollin
the boats direction safel
. The reefin
lines are
also lead back to the cockpit for
our convenience
For detailed ree
in
instructions. Please
amiliarize
our-
self and the crew with this
rocess as it is a vital tool in
sa
e boat handlin
in adverse weather conditions!
12.5 Reefin
Instruction
1. Run both reefin
lines as illustrated in the boom &
ree
la
out. The shorter ree
line will be used on the
irst
reef
Starboard Side, Green
. The lon
er reef line on the
second reef
Port Side, Red
.
2. R
i
th
m
in
il.
. Ease the mainsheet and van
4. Lower the main sail to approximatel
the first ree
position.
. Take u
the slack in the first reef line until the tack and
th
l
w
r
wn t
t 2”
v
th
m
. Ad
ust the main hal
ard so that the tack reef point is
not contactin
the
oose neck on the
ront o
the spar
and is appl
in
tension to the luff of the main above the
ree
, not below. There will be approximatel
6”
150mm
stretch in the main lu
and main hal
ard when the ree
-
n
ne
s tens
one
, so, ma
e sure t
at t
s
s a
owe
or when ad
ustin
the main hal
ard to locate the tack
r
l
k
7. Confirm that the tack reef
oint is still clear of the tack
shackle and that onl
the main lu
above the ree
crin
le
is tensioned, not the lu
between the crin
le and the top
stacked sail slide. Ease the reef line and read
ust the
hal
ard i
necessar
.
. Mark the hal
ard at the stopper with 1”
25mm
sin
le
band o
indelible marker ink. B
droppin
the hal
ard to
this mark ever
time, positionin
is made easier. The hal-
ard is automaticall
in the correct position for the reef
. Repeat the procedure
or the second ree
, usin
double
bands to mark the hal
ard in the correct position.
12.6 Reefin
Procedur
1. Head up into the wind.
2. Ease the mainsheet and van
. Check the toppin
lift for adequate boom support.
4. Lower the main hal
ard to the appropriate mark and
snub the line with the stopper.
. Tension the reefin
line with the self-tailin
winch until
the ree
clew is brou
ht down to the boom. Appl
stopper
and tension the main hal
ard back up, ease the toppin
lift
if needed
.
12.7 Shakin
Out a Reef
1. Head up into the wind.
2. Ease the mainsheet and van
. Release the tension on
the toppin
. Lift
if needed
. Release the line stopper and remove ree
line
rom
win
h.
4. Tension the main hal
ard to raise sail, makin
sure ree
lines run
reel
while sail is bein
raised. Appl
stopper
to main hal
ard.
. Re-tension van
and mainsheet, ease the toppin
li
t
if needed
.