unter 45DS •
erator's Manua
.3 Pumps 9.4
.4 Pickups and Strainers 9.
.4.
Water Heater
.
.4.6.1 Water Temperature Ad
ustment 9.6
Troubleshooting 9.7
Fresh Water Layout 9.9
Air Conditioning Plumbing Layout 9.11
Through Deck Locations 9.13
10. Sanitar
S
stems 10.
10.1 Drains and Dischar
es 10.
10.2 Pumps 10.3
10.3
ther Waste Related Equipments 10.4
10.4 Head S
stem 10.
10.5
perations and Maintenance 10.
Bilge Pump System Layout 10.9
Waste System (Grey Water) 10.11
Waste System (Black Water) 10.13
11. En
ines and Transmissions 11.
11.1 En
ines 11.
11.2 Tr
n
mi
i
n
11.4
11.3
perations and Maintenance 11.4
Troubleshooting 11.6
Exhaust System 11.9
12. Sails and Ri
in
12.
12.1 Main Ri
Components 12.
12.2 Th
M
t 12.
12.
The Boom 12.
12.4 The
ails 12.
12.5 Reefin
Instructions 12.
12.6 Reefin
Procedure 12.
12.7 Shakin
ut a Reef 12.
12.8 Spinnaker
ption
12.1
12.
The Arch 12.1
12.10 Protectin
Your Ri
in
12.1
StandardRunning Rigging 12.13
Optional Furling Running Rigging 12.14
Standing Rigging Specifications 12.15
Jib Furling Line Layout 12.16
Mainsheet Traveler 12.17
Arch Installation 12.18
Arch Installation (Continued) 12.19
Standard and Option Vang Details 12.20
Optional Spinnaker Layout 12.21
Lazyjack Installation 12.22 -12.23
13. Gettin
Underwa
13.
13.1 Boardin
Your Boat 13.
13.2 Startin
the En
ine 13.3
13.3 Gettin
Underwa
13.4
13.4 Returnin
to Port 13.6
13.5 Emer
enc
perations 13.6
14. Maintenance 14.
14.1 M
int
n
n
M
t
ri
l
14.
14.2 Ext
ri
r 14.
14.
Interior 14.4
14.4 Mechanical S
stems 14.
14.
Periodic Maintenance 14.
14.6 Stora
e and Liftin
14.
14.7 Fittin
out after Stora
e 14.
tin
M
int
n
n
14.11-14.1
15. Glossar
15.