The next step is going to be drilling.
The drill must be positioned
T0303
G92 S1000
G97 M3 S700
G54
G0 G95 Z.25
X0.
There are several drilling cycles
G81 X___ Z___ F___ S___ (standard drill cycle)
G82 X___ Z___ P___ F___ S___ (dwell drill cycle)
G83 X___ Z___ P___ Q___ F___ S___ (peck drill cycle)
G83.1 X___ Z___ P___ Q___ F___ S___ (chip breaker)
X - X position
Z - Depth
F - Feed
S - Speed (RPM)
P - Dwell at the bottom of the hole
Q - Peck depth
G83 X0. Z-1.5 P1. Q.1 F.005 S700
G80 (CANCELS CANNED CYCLE)
M5 (STOP SPINDLE)
The drill needs to be sent home.
G28 U0. W0. (SENDS TURRET HOME)