INSTALLATION AND OPERATION INSTRUCTIONS
1-26
SFT 199 TANKLESS WATER HEATER
Remarks:
Number:
Material:
Projectnr:
Author:
Date:
Name:
Projection:
Size:Units:
Scale:
16/10/11 HBs16-061
Zie opmerkingen
-
Intergas Verwarming BV
Coevorden - The Netherlands
00
Rev:
This document remains our property. Without restricted approval from the owner it is not allowed to copy or show this document to a third party.
unless
otherwise
mentioned
±0.10
±0.20
±0.50
±0.20
±0.50
±0.80
±0.30
±0.80
±1.00
±0.50
±1.20
±2.00
±1.00
±2.00
±3.00
±1.50
±3.00
±5.00
0..5 5..30 30..100 100..500 500..1300 1300..>Dimensions
Tolerances
Sticker Ladder Wiring Superflow Tankless IBC 899994
1:1
A3mm
jj/mm/dd
Notes:
- Original wiring as supplied with the appliance must be replaced with type T wire or
its equivalent.
- The wiring for the 120V field connections to the appliance shall have a minimum
size of 14 AWG and a temperature rating of at least 194 °F (90°C).
Wire Color Code Key:
BK - Black
W - White
G - Green
BL - Blue
R - Red
O- Orange
V - Violet
Y - Yellow
BR - Brown
GY - Gray
High Voltage
Control Module
Control Module
Low Voltage
Control Module
899994.01
SFT series Schematic Wiring Diagram
SFT series Ladder Wiring Diagram
X1
Blower
Motor
Motor120V
Power Plug
Ignition
Ignition
3 way valve
3 Way Valve
BMM
BMM
Gasvalve
Gasvalve
DHW Flow Sensor
DHW Flow Sensor
DHW Cold NTC
DHW Cold Sensor
DHW Hot NTC
DHW Hot Sensor
16
Heat ex. Sensor
Heat ex. Sensor
Flue Sensor
Flue Sensor
X1X2
X2
X3
X3
X4
X4
X5
2 1
X5
5 4 3 26 1
19/05/01 HBs19-217color code key added and material changed01
X8
X8
3 24
5
1
X9
X9
7
6
5 4 3 2 1
8
X14
X14
Power Plug
120V
X15
X15
Blower
17
13
Y
Y
W
W
O
O
O
O
G/Y
G/Y
G
R R
R
R
R
BL
BL
GY
GY
GYGY
GY
BK
BK
BK
BK
V
BK
BK
BL
BL
V
BR
BR
12 11
10
9
7 6
5
4 12
3
Figure 25: Electrical Wiring Connections (full page ladder diagram at back of this manual)