SL 26-260 G3 - Conversion to propane (NG-LP) - P-Kit 300
| 5
Completing and Affixing the Conversion Labels
1. Fillintheconversionlabels(includedinthekit)associatedwiththenewfueltype.
2. Placetheconversionlabelsontotheboileratthepositionsindicatedonthelastpage.
Clocking the Meter (Natural Gas)
1. Turnoffallotherappliancesandpilots.
2. Turnontheboilerandsettheboilertohighfire.
3. Ensuretheboilerhasalargeloadtoheat,sothattheboilerwillnotshutoff.
4. WithaStop-Watch,recordthenumberofsecondsforthesmallestdialtomake1fullrevolution.
5. CFH=(3600xDialSize)/Seconds.
6. CFHx1000(checklocalBtucontent)=InputBtu’s.
Note
For2PSImetersmultiplyCFHx1.097
ForMetricmetersmultiplyCFHx35.3
For2PSImetricmetersmultiplyCFHx1.097x35.3
ForAltitudeabove4,500’deduct2%per1,000’ofaltitudefromtheInputBtu’s.