7.4 Cleaning the condensate trap
Warning
If condensate neutralization is used, check the pH level of condensate before and after
neutralization to verify effectiveness and ensure that the discharge has neutral pH levels.
Never operate the boiler unless the trap is filled with water. Failure to comply will result in
severe personal injury or death.
Condensate traps should
be checked every year,
cleaned and refilled as
necessary. Before
cleaning the condensate
trap, you must turn off the
power to the boiler, and
allow it to cool down.
Important: Installers or
service contractors should
ensure that the end user is
instructed on cleaning and
refilling the trap.
Warning
Before
replacing the
condensate
trap, turn off the
power to the
boiler and allow
to cool down.
89
7.4 Cleaning the condensate trap

Table of Contents

Other manuals for IBC SL 40-399 G3

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the IBC SL 40-399 G3 and is the answer not in the manual?