Routing the cables through the cable-management arm
__ After you attach the cables to the cable-management arm, go to the front of the rack and move the system
drawer in and out. Observe the cables and cable-management-arm movement to verify that the cables are
not binding.
After you finish
__ Did you receive a cable hook with your rack shipment?
v No. Proceed to the next item.
v Yes. The cable hook manages the server cables in the back of the rack. To install the cable hook, slide it into
the slots that are located on the back of the rack as shown here:
__ Return to your initial server setup checklist and complete the next step.
134 System i and System p: Cabling your server

Table of Contents

Other manuals for IBM 9406-520

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the IBM 9406-520 and is the answer not in the manual?

IBM 9406-520 Specifications

General IconGeneral
BrandIBM
Model9406-520
CategoryServer
LanguageEnglish

Related product manuals