EasyManua.ls Logo

IBM BJ0NJML - Service And Asset Management - Page 309

IBM BJ0NJML - Service And Asset Management
330 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Collaboration Switch Additions
295
After you perform this procedure, the INV collaboration switches will have the
following values.
For example, when you set the value of the ISUIN integration control to 1, the
issue transactions are accepted from an external system. The INV collaboration
switch controls the update of inventory balance and cost related to issues. You can
adjust the setting of this switch, if necessary, so that the system bypasses that
update process.
The INV/EXT/THISMX collaboration switch controls the processing of inventory
(Process Control ID = INV) that is issued in the external system (System ID 1 =
EXT) and owned by the system (System ID 2 = THISMX).
If the value of the INV/EXT/THISMX collaboration switch were 0, the inventory
balance and cost values are updated. This is the default processing.
If the value of the INV/EXT/THISMX collaboration switch were 1, the default
processing is bypassed. The inventory balance and cost values are not updated.
In the example, ISUIN accepts any issues into the system. The INV/EXT/THISMX
collaboration switch determines how the inventory business component
processes a specific type of issue.
Process Control ID System ID 1 System ID 2 Process Control
Value
INV THISMX EXT 1
INV EXT THISMX 1
INV EXT EXT 1
INV ORC THISMX 0

Table of Contents

Related product manuals