Routing the cables through the cable-management arm
__ After attaching the cables to the cable-management arm, go to the front of the rack and move the system
drawer in and out. Observe the cables and cable-management-arm movement to verify that the cables are
not binding.
Starting your server
__ Power the system on.
Note: Expect a delay between the time that the power is applied to the server or workstation and the time that
an initial program load (IPL) can be performed. When power is initially applied to the server or workstation, the
service processor performs a self-check and leaves the control panel blank for up to two minutes. You must wait
until the C1XX XXXX progress codes are complete and the control panel displays 01 before you perform an IPL or
change the control panel functions.
After you finish
__ Did you receive a cable hook with your rack shipment?
v No. Proceed to the next item.
v Yes. The cable hook manages the server cables in the back of the rack. To install the cable hook, slide it into
the slots that are located on the back of the rack as shown here:
__ Return to your initial server setup checklist and complete the next step.
174 System i and System p: Cabling your server

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the IBM System i and is the answer not in the manual?

IBM System i Specifications

General IconGeneral
Operating SystemIBM i
Form FactorRackmount, Tower
ProcessorPOWER5, POWER6, POWER7, POWER8, POWER9
Securityencryption
NetworkingEthernet
Reliabilityredundant components
CPUPOWER processors
MemoryUp to several terabytes depending on model

Related product manuals