MANIFOLDPRESSUREAND ORIFICESIZE FOR HIGHALTITUDEAPPLICATIONS
NATURALGAS
MEAN ELEVATION FEET ABOVE SEA LEVEL
HEATING VALUE 0 to 2000 to 3000 to 4000 to 5000 to 6000 to 7000 to
BTU/CU. FT. 1999 2999 3999 4999 5999 6999 8000
800 3.5" wc 3.5" wc 3.5" wc 3.5" wc 3.5" wc 3.5" wc 3.5" wc
850 3.5" wc 3.5" wc 3.5" wc 3.5" wc 3.5" wc 3.5" wc 3.5" wc
900 3.5" wc 3.5" wc 3.5" wc 3.5" wc 3.5" wc 3.5" wc 3.4" wc
950 3.5" wc 3.5" wc 3.5" wc 3.5" wc 3.3" wc 3.2" wc 3.1" wc
t000 3.5" wc 3.4" wc 3.3" wc 3.2" wc 3.0" wc 2.9" wc 2.8" wc
t050 3.2" wc 3.t" wc 3.0" wc 2.9" wc 2.7" wc 2.6" wc 2.5" wc
1100 2.9" wc 2.8" wc 2.7" wc 2.6" wc 2.5" wc 2.4" wc 2.3" wc
Orifice Size #42 #42 #42 #42 #42 #42 #42
LP Gas
MEAN ELEVATION FEET ABOVE SEA LEVEL
HEATING VALUE 0 to 2000 to 3000 to 4000 to 5000 to 6000 to 7000 to
BTU/CU. FT. 1999 2999 3999 4999 5999 6999 8000
2500 10.0" wc 10.0" wc 9.4" wc 10.0" wc 9.8" wc 8.8" wc 7.9" wc
Orifice Size #54 #54 #54 #55 #55 #55 #55
NOTE: NATURAL GAS DATA BASED ON 0.60 SPECIFIC GRAVITY. PROPANE DATA BASED ON 1.53 SPECIFIC GRAVITY.
FOR FUELS WITH DIFFERENT SPECIFIC GRAVITY CONSULT THE LATEST EDITION OF THE NATIONAL FUEL GAS CODE ANSI
Z223.1 and CAN B149.
---"_;nanging Orifices Manifold (Downflow)
1. After disconnecting power and gas supply to the furnace, re-
move the access door, exposing the burner compartment.
a. Remove the five (5) screws holding the burner box cover
to expose the manifold and burners. (Figure8 or
Figure 9)
2. Disconnect gas line and pilot tubing from gas valve so man-
ifold can be removed.
3. Disconnect wiring at gas valve. Be sure to note the proper
location of any and all electrical wiring disconnected.
4. Remove the four (4) screws holding the manifold and gas
valve to the manifold supports. Do not discard any screws.
See Figure 8 or Figure 9.
25-22-38
iiiiiiiiiiiiiiiiiiiiiill¸;!i_i_i_i_i_i_i!_!_!_!_ii_!i!i!ii;_!_;i_:iiiii!iiiiiiiii_iiiiiiiiiii!i!i!i!i!i!i!i!i!i!i!i!i!i_!iii!_iiii!ii_i!_
Manifold (Upflow/Horizontal)
5. Carefully remove the manifold assembly.
6. Remove the orifices from the manifold and replace them with
proper sized orifices. See Figure 10.
7. Tighten orifices so it is seated and gas tight.. See Figure 10.
Clearances
Measure from face of orifice
_m°at hi_ob_ck side Of the
__ 1 11' (28 2mm)
441 012308 01 [_

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the ICP NTC6/GNE Series and is the answer not in the manual?

ICP NTC6/GNE Series Specifications

General IconGeneral
BrandICP
ModelNTC6/GNE Series
CategoryFurnace
LanguageEnglish

Related product manuals