Turn power off, break circuit, insert meter in
series, then turn power back on.
WARNINGS:
• Check fuse for continuity before testing.
• Use the proper switch position and lead
inputs.
• Never attempt to measure current on
circuits or equipment with more than
600 volts potential.
• Duty cycle: 15sec ON / 15min OFF for
10A MAX