EasyManua.ls Logo

IDEAL EXALT Solo 155 User Manual

IDEAL EXALT Solo 155
44 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
The installation must conform to the
requirements of the authority having
jurisdiction or, in the absence of such
requirements, to the National Fuel Gas
Code, ANSI Z223.1/ NFPA 54, and/or
Natural Gas and Propane Installation
Code, CAN/CSA B149.1.
NOTICE
VENT SUPPLEMENT
Exalt Solo 110-155-199 & Exalt Combi 155-199
223924 A01 - October 2019
2019-31
This document is intended to be used by a factory trained and qualified heating
contractor or service technician only. Read all Instructions within this document and
within the relevant Boiler Installation and Maintenance Manual before proceeding.
It is recommended to follow the procedures in the steps given. Skipping or missing
procedural steps could result in substantial property damage, serious injury, or death.
WARNING

Table of Contents

Other manuals for IDEAL EXALT Solo 155

Question and Answer IconNeed help?

Do you have a question about the IDEAL EXALT Solo 155 and is the answer not in the manual?

IDEAL EXALT Solo 155 Specifications

General IconGeneral
ModelEXALT Solo 155
TypeCondensing Boiler
Fuel TypeNatural Gas
MountingWall Mounted
Dimensions (H x W x D)700 x 395 x 278 mm
ERP EfficiencyA
Central Heating Output3.7 - 15.3kW
Domestic Hot Water Output3.7 - 15.3kW

Summary

Product and Safety Information

General Warning

General warning about reading all instructions and potential consequences of non-compliance.

General Danger

Indicates a hazardous situation that will result in substantial property damage, serious injury, or death.

Chapter 1 - Pre-Installation Requirements

1.3. Vent/Combustion Air Piping and Materials

Specifies materials and guidelines for vent and combustion air piping.

1.3.1 PVC and CPVC Vent and Combustion Air Piping and Fittings

Details approved PVC and CPVC materials for vent and combustion air piping.

1.3.3 AL29-4C® Stainless Steel Vent Piping and Fittings

Lists approved AL29-4C® Stainless Steel vent manufacturers and components.

1.3.4 Polypropylene (PP) Vent Piping and Fittings

Lists approved polypropylene vent manufacturers and components.

1.5. Vent Restrictions

Outlines restrictions and requirements for vent system installations.

1.5.1 2 Inch (60 mm) Vent System Restrictions

Details specific restrictions for 2-inch (60 mm) vent systems, including clearances.

1.5.2 Rigid Polypropylene Vent System Restrictions

Specifies restrictions and installation requirements for rigid polypropylene vent systems.

1.5.3 Flex Polypropylene Vent System Restrictions

Details restrictions and installation requirements for flex polypropylene vent systems.

1.6. Combustion Air Contamination

Identifies potential contaminants and areas affecting combustion air quality.

Chapter 2 - Direct Vent Installation of Vent/Air Piping

2.1. Direct Vent - Vertical - Through the Roof or Unused Chimney

Installation guidelines for direct vent systems through roofs or chimneys.

2.1.1 Determine Termination Location

Guidelines for determining the proper location for vent and combustion air terminations.

2.1.2 Direct Vent - Vent Installation - Through the Roof

Instructions for installing the vent and combustion air piping through the roof.

2.1.3 Termination Fittings - Through the Roof

Specifies fittings and methods for terminating vent/combustion air through the roof.

2.2. Direct Vent - Horizontal - Sidewall

Instructions for direct vent installation through a sidewall.

2.2.1 Determine Termination Location

Guidelines for determining sidewall termination locations for vent and combustion air.

2.2.2 Direct Vent - Vent Installation - Sidewall

Instructions for installing direct vent piping through a sidewall.

Chapter 3 - Category IV (Indoor Air) Installation of Vent/Air Piping

Chapter 4 - Installation Requirements

Chapter 5 - Commonwealth of Massachusetts Installation Requirements

Related product manuals