The installation must conform to the
requirements of the authority having
jurisdiction or, in the absence of such
requirements, to the National Fuel Gas
Code, ANSI Z223.1/ NFPA 54, and/or
Natural Gas and Propane Installation
Code, CAN/CSA B149.1.
NOTICE
VENT SUPPLEMENT
Exalt Solo 110-155-199 & Exalt Combi 155-199
223924 A01 - October 2019
2019-31
This document is intended to be used by a factory trained and qualified heating
contractor or service technician only. Read all Instructions within this document and
within the relevant Boiler Installation and Maintenance Manual before proceeding.
It is recommended to follow the procedures in the steps given. Skipping or missing
procedural steps could result in substantial property damage, serious injury, or death.
WARNING

Table of Contents

Other manuals for IDEAL EXALT Combi 199

Question and Answer IconNeed help?

Do you have a question about the IDEAL EXALT Combi 199 and is the answer not in the manual?

IDEAL EXALT Combi 199 Specifications

General IconGeneral
BrandIDEAL
ModelEXALT Combi 199
CategoryBoiler
LanguageEnglish

Summary

CHAPTER 1 - PRE-INSTALLATION REQUIREMENTS

1.6. Combustion Air Contamination

Identifies potential contaminants and areas that can affect combustion air quality.

CHAPTER 2 - DIRECT VENT INSTALLATION OF VENTAIR PIPING

2.1. Direct Vent - Vertical - Through the Roof or Unused Chimney

Instructions for routing vent and combustion air vertically through a roof or chimney.

2.1.1 Determine Termination Location

Guidelines for selecting appropriate locations for vertical vent and combustion air terminations.

2.1.2 Direct Vent - Vent Installation - Through the Roof

Steps for penetrating the roof and installing vent/air piping.

2.2. Direct Vent - Horizontal - Sidewall

Instructions for routing vent and combustion air horizontally through a sidewall.

2.2.1 Determine Termination Location

Guidelines for selecting appropriate locations for sidewall vent and combustion air terminations.

2.2.2 Direct Vent - Vent Installation - Sidewall

Steps for penetrating the sidewall and installing vent/air piping.

2.3. Direct Vent - Vertical Vent and Sidewall Combustion Air

Instructions for a combined vertical vent and sidewall combustion air setup.

2.3.1 Determine Termination Location

Guidelines for selecting locations for combined vertical vent and sidewall combustion air terminations.

2.3.2 Direct Vent - Vent Installation - Through the Roof

Steps for roof penetration for vertical vent installation.

2.3.3 Direct Vent - Combustion Air Installation - Sidewall

Steps for sidewall penetration and installation of combustion air piping.

CHAPTER 3 - CATEGORY IV (INDOOR AIR) INSTALLATION OF VENTAIR PIPING

3.1. Category IV - Vertical - Through the Roof or Unused Chimney

Instructions for Category IV vertical venting through roof/chimney.

3.1.1 Determine Termination Location

Guidelines for selecting vertical termination locations for Category IV systems.

CHAPTER 4 - INSTALLATION REQUIREMENTS

4.4. Carbon Monoxide Detector Installation

Recommendations and requirements for installing carbon monoxide detectors.

CHAPTER 5 - COMMONWEALTH OF MASSACHUSETTS INSTALLATION REQUIREMENTS

5.1. Installation of Carbon Monoxide Detectors

Requirements for installing carbon monoxide detectors in Massachusetts.