EasyManua.ls Logo

IDEAL Vogue System Gen 2 S32 User Manual

IDEAL Vogue System Gen 2 S32
80 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
When replacing any part on this appliance, use only spare parts that you can be
assured conform to the safety and performance specification that we require.
Do not use reconditioned or copy parts that have not been clearly authorised by Ideal.
For the very latest copy of literature for specification and maintenance practices visit our
website www.idealboilers.com where you can download the relevant information in PDF format.
March 2017
UIN 216172 A04
VOGUE SYSTEM GEN2
S15 S18 S26 S32
INSTALLATION
AND SERVICING

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the IDEAL Vogue System Gen 2 S32 and is the answer not in the manual?

IDEAL Vogue System Gen 2 S32 Specifications

General IconGeneral
BrandIDEAL
ModelVogue System Gen 2 S32
CategoryBoiler
LanguageEnglish

Summary

SECTION 1 - GENERAL

Safe Handling and Safety Regulations

Guidelines for safe manual handling and relevant safety standards.

Installation Requirements and Safety

Safety regulations, British Standards, and gas/flue installation requirements.

SECTION 2 - INSTALLATION

Flue Length and Pack Determination

Guidance on selecting correct flue kits and lengths.

Flue Terminal Position Requirements

Guidelines for correct flue terminal placement and dimensions.

Electrical Connections and Mains Wiring

Safety, regulations, and connecting the boiler to mains supply.

Commissioning and Testing Procedures

Procedures for commissioning and testing the boiler.

Initial Lighting Procedure

Step-by-step guide for the first ignition of the boiler.

SECTION 3 - SERVICING

Servicing Schedule and Inspections

Recommended servicing intervals and general inspection procedures.

SECTION 4 - FAULT FINDING

Fault Finding Chart and Lockout Procedures

Main fault finding chart and procedures for overheat, ignition, and flame loss lockouts.

PCB and CH/HW Fault Troubleshooting

Troubleshooting for PCB connection issues and CH/HW faults.

Display and Boiler Fault Troubleshooting

Troubleshooting for display errors and general boiler faults.

SECTION 5 - SPARE PARTS

Code Of Practice

Benchmark Commissioning and Servicing

Commissioning Checklist and Service Records

Forms for recording installation, commissioning, and service details.

Combustion Analysis Flowchart

Flowchart for performing CO level and combustion ratio checks.

Related product manuals