EasyManua.ls Logo

IMER KOINE 4 - Water Connection; Air Connection; Start-Up

IMER KOINE 4
10 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5
IMER INTERNATIONAL S.p.A.
KOINE 4/5
10.2 WATER CONNECTION
&RQQHFWWKHZDWHUKRVHWDEOHWRWKHZDWHUPDLQV¿J
7KHZDWHUPDLQVPXVWJXDUDQWHHDPLQLPXPÀRZUDWHRI
20l/min.
2WKHUZLVHDWDQNRIVXLWDEOHFDSDFLW\OPXVWEH¿WWHGZLWK
clean water, to be kept full at all times, and from which water can
be taken by means of the self-priming pump supplied with the
machine. In this case the hose must have a minimum diameter
RIDPD[LPXPOHQJWKRIPSUHIHUDEO\DIRRW¿OWHUDQGPXVW
not be subject to deformation during use.
&DXWLRQ7KH¿UVWWLPHWKHZDWHUSXPS
is connected to the tank, it must be activated by manually
¿OOLQJWKHLQWDNHOLQH
The same operation must be repeated each time the circuit is
drained, or after a prolonged period of disuse.
FIG.6
10.4 AIR CONNECTION
&RQQHFWWKHDLUKRVHWRWKHPDFKLQHSDQHODQGVSUD\MHW¿J
FIG.7
11. START-UP
&ORVHWKHDLUYDOYHUHIDVXSSO\LQJWKHVSUD\MHW¿J
Open the micrometric valve (ref.8) virtually fully.
Turn the main switch/inverter (ref.1a) to position 1 or 2: in the
correct position the blue “phase correct” lamp illuminates (ref.1g).
Check that the water pressure gauge (ref.11) indicates a minimum
pressure of 3.5 bar and that the green “no water pressure” lamp
(ref.1i) is off. Otherwise, activate the pump by means of the water
pump switch (ref.1f). Press the water supplement pushbutton
(ref.1d) for 3-4 seconds.
Start the pump by means of the start pushbutton (ref.1c):
the lamp on the start/stop pushbutton illuminates and the mortar
pump starts up for a few seconds.
Open the spray jet air valve: the machine starts up. Check that the
water pressure does not fall below 2.5 bar; otherwise activate the
ZDWHUSXPS8VHWKHPLFURPHWULFYDOYHWRUHJXODWHWKHZDWHUÀRZ
UDWHGLVSOD\HGRQWKHÀRZPHWHUUHIZLWKUHVSHFWWR
- 800l/min if using gypsum based materials (pump D 6-3).
- 500l/min if using cement based materials (pump D 6-3).
Start the cell wheel by means of the relative switch (ref.1e) and
then stop it.
Close the air valve.
Fill the hopper with dry materials.
Open the air valve of the jet. Activate and deactivate the cell wheel
3 or 4 times by means of the relative switch
(2 -3 seconds operation, 2-3 seconds stopped) and then switch
on permanently. Regulate the water to obtain the consistency a
s
recommended by the material manufacturer. Close the air valve to
the spray gun. Check the material hoses to ensure perfect condi-
WLRQWKDWFRXSOLQJVDUHLQWDFWDQGWKHUHODWLYHVHDOVDUH¿WWHGDQG
SRXUDSSUR[OLWUHVRIJURXWLQWKH¿UVWVHFWLRQDQGWKHQFRQQHFW
them to the delivery manifold (ref.10) and spray jet. Check that
the cam levers ( A ) of the couplings have been tightened correctly
and that the seal
%LV¿WWHGDVVKRZQLQ¿J
FIG.8
FIG8
FIG.9
Start the machine: when the correct consistency of material is
delivered from the jet normal operation can be started.
The machine starts and stops by opening and closing the air
supply to the spray jet.
7KHPDFKLQH LV¿WWHG ZLWKSURWHFWLRQ DJDLQVWSRZHU IDLOXUHDQG
water pressure failure: if one of these occur, press the start pu-
shbutton to resume operation.
To stop the machine in the event of an emergency, press the red
emergency pushbutton (ref.1b) to shut down the machine - all
moving parts are shut down - and then turn the main switch to 0
and remove the electric power plug from the socket (ref.1l).

Other manuals for IMER KOINE 4

Related product manuals