7
CAVO ALIMENTAZIONE
1-3
INSTALLERUSERMAINTENANCE TECHNICIAN
1.4 GAS CONNECTION.
Our boilers are designed to operate with methane
gas (G20) and LPG. Supply pipes must be the
same as or larger than the 3/4”G boiler tting.
Before connecting the gas line, carefully clean
inside all the fuel feed system pipes to remove
any residue that could impair boiler eciency.
Also make sure the gas corresponds to that for
which the boiler is prepared (see boiler data
name plate). If dierent, the appliance must be
converted for operation with the other type of
gas (see converting appliance for other gas types).
The dynamic gas supply (methane or LPG)
pressure must also be checked according to the
type used in the boiler, which must comply with
the technical standards in force, as insucient
levels can reduce generator output and cause
malfunctions.
Ensure correct gas cock connection. e gas sup-
ply pipe must be suitably dimensioned according
to current regulations in order to guarantee cor-
rect gas ow rate to the burner even in conditions
of maximum generator output and to guarantee
appliance eciency (technical specications).
e coupling system must conform to technical
standards in force.
Fuel gas quality. e appliance was designed
to operate with combustible gas free of impuri-
ties; otherwise it is advisable to t special lters
upstream of the appliance to restore the purity
of the fuel.
Storage tanks (in case of supply from LPG
depot).
- New LPG storage tanks may contain residual
inert gases (nitrogen) that degrade the mixture
delivered to the appliance casing functioning
anomalies.
- Due to the composition of the LPG mixture,
layering of the mixture components may occur
during the period of storage in the tanks. is
can cause a variation in the heating power of
the mixture delivered to the appliance, with
subsequent change in its performance.
1.5 HYDRAULIC CONNECTION.
Attention: in order not to void the heat primary
exchanger warranty, before making the boiler
connections, carefully clean the heating system
(pipes, radiators, etc.) with special pickling or
de-scaling products to remove any deposits that
could compromise correct boiler operation.
A treatment of the heating and water system wa-
ter is required, in compliance with the technical
standards in force, in order to protect the system
and the appliance from deposits (e.g. scale),
slurry or other hazardous deposits.
Water connections must be made in a rational
way using the couplings on the boiler template.
e boiler safety valves outlet must be connected
to a draining funnel. Otherwise, the manufactur-
er declines any responsibility in case of ooding
if the drain valve cuts in.
Attention: the manufacturer declines all liability
in the event of damage caused by the installation
of an automatic lling system.
In order to meet the system requirements es-
tablished by the technical regulation in force in
relation to the pollution of drinking water, we
recommend installing the IMMERGAS anti-
backow kit to be used upstream of the cold
water inlet connection of the boiler. It is also
recommended that the heat transfer uid (e.g.
water + glycol) entered in the primary circuit
of the boiler (heating circuit), complies with the
local regulations in force.
Attention: to preserve the duration and the ef-
ciency features of the appliance, in the presence
of water whose features can lead to the deposit of
scale, installation of the “polyphosphate dispenser
kit is recommended.
1.6 ELECTRICAL CONNECTION.
e “Maior Eolo” boiler has an IPX5D protection
rating for the entire appliance. Electrical safety
of the appliance is reached only when it is cor-
rectly connected to an ecient earthing system
as specied by current safety standards.
Attention: the manufacturer declines any re-
sponsibility for damage or physical injury caused
by failure to connect the boiler to an ecient
earth system or failure to comply with the refer-
ence standards.
Also ensure that the electrical installation cor-
responds to maximum absorbed power specica-
tions as shown on the boiler data-plate. Boilers
are supplied complete with an “X” type power
cable without plug. e power supply cable must
be connected to a 230V ±10% / 50Hz mains sup-
ply respecting L-N polarity and earth connection;
, this network must also have a multi-pole cir-
cuit breaker with class III over-voltage category.
When replacing the power supply cable, contact
a qualied rm (e.g. the Authorised Aer-Sales
Technical Assistance Service). e power cable
must be laid as shown (Fig. 1-3).
In the event of mains fuses replacement on the
modulation board, use a 3.15A fast fuses. For
the main power supply to the appliance, never
use adapters, multiple sockets or extension leads.
SUPPLY VOLTAGE CABLE
STD.002998/004