EasyManua.ls Logo

Impex IGS-5100 - Bench Assembly - Step 6: Foam and Roll Installation

Impex IGS-5100
33 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
STEP 6 (See Diagram 6)
A.) Insert two Foam Tubes (#16) halfway through the holes on Leg Developer (#12).
B.) Push four Vinyl Foam Rolls (#27) onto the Tubes from both ends.
C.) Push four Foam Roll End Caps (#31) into the ends.
D.) Attach the Arm Curl Handle (#19) to the back holes on the Leg Developer. Secure it with a
Lock Pin (#20). Attach the Abdominal Strap (#24) to the front holes on the Leg Developer.
Secure it with a Lock Pin (#20).
E.) Pull up and flip the Arm Curl Pad along the track to face the back of the machine when
doing abdominal exercises using the Abdominal Strap.
F.) Remove the Arm Stand and Abdominal Strap when doing Leg Developer exercises.
29

Related product manuals