39
Dynamic Load Calibration - When load curtailment
is required, and an EV is present
In order to complete Dynamic Load calibration, the following conditions
need to be true:
1. An EV is present
2. Smart PRO is connected to the customer’s (or your own) electric vehicle
(for socketed variants the customer’s intermediate charging cable will be required)
3. EV Battery State of Charge is less than 90%