EonStor DS S12/S16/S24 Series Hardware Manual
3.8.5 LCD Screen
When powering on the RAID subsystem, wait for the front panel LCD screen to show
“READY” or “No Host LUN.”
The LCD screen startup sequence is shown and described in the sequence below:
Initializing…
Please Wait...
This screen appears when the PSUs are
turned on.
Power On Self Test Please
Wait…
System is performing a self test.
Power on
Init Completed..
System power-on self test is completed.
DS S12x-xxxx
System is accessing various interfaces.
DS S12x-xxxx
1GB RAM, Wait...
Verifying installed memory.
DS S12x-xxxx
System is ready. You can now start to
configure the subsystem.
DS S12x-xxxxx
Ready
System is ready for I/Os.
102