EonStor DS S12/S16/S24 Series Hardware Manual
3.8 Power Connections
Once all of the disk drives have been properly installed and the I/O ports or
management interfaces have been connected, the subsystem can be powered on.
3.8.1 Checklist
BEFORE powering on the subsystem, please check the following:
DIMM module: The cache memory comes as a pre-installed module. If a
separately-purchased memory is applied, make sure the module has been
correctly installed on the controller boards.
CBM: Make sure the CBM has been properly installed, if necessary, before
power-on.
Hard drives: Hard drives have been correctly installed in the drive trays.
Drive trays: All the drive trays, whether or not they contain a hard drive, have
been installed into the subsystem.
Cable connections: The subsystem has been correctly connected to host
computer(s), management computers, or external networking devices.
Power cords: The power cords have been connected to the PSUs on the
subsystem and plugged into the main power source.
Ambient temperature: All subsystem components have been acclimated to the
surrounding temperature.
97