General Installation Instructions:
Dryer to be positioned no closer than 12 inches
from wall.
No special Flooring is required.
Dryer must be vented prior to Start-Up.
Utility Hook-ups must conform to local codes.
Dryer produced under UL Code 795, Fourth
Addition-Commercial Industrial Gas Heating
Equipment.
208/230 3 Phase 15.5 FLA
Gas @ 3/4" NPT @ 6-11" WFC
Optional IR Panel
Infeed
208/230 3 Phase 17.5 FLA
IR
4 Foot Standard
6Footw/IR
MD-8
Site Installation
Customer Supplied Ductwork
Dryer equipped with a 6" Exhaust Hook-
Up Connection.
6" Exhaust Duct Customer Installed