EasyManua.ls Logo

International 710 - ON-THE-LAND OPERATION SETUP

International 710
48 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
SETTING
UP
ON-THE-LAND OPERATION
Remove
all wires and
arrange
the
parts
conveniently.
Lubricate
all
bearings
and moving
parts
as
you
proceed, and
see that
they
work
freely.
Bolts
must be
used in the holes
in
which
they
are found,
or in the
parts to
which they
are
attached,
unless
otherwise
shown.
Whenever
the
terms
"left"
and "right"
are
used,
it
should
be
understood
to mean
from
a position
behind
and
facing
the
machine.
When
beginning
to
assemble
it
is recom-
mended
that
the
plow
frame
be laid
over
sup-
ports
about
30 inches
high
until
the hitch
and
wheels
are
installed.
When
the
plow can
be
hitched
to
the
tractor
and
the
hydraulic
con-
nected;
raise the
plow
and
put on
the
bottoms
and
colters.
Tie
Rod (Front
End)
lust.
28
MA
3329B
lllust.
28A
-
Locate
and
secure tie rod for
16-inch and
18-inch plows as shown.
28

Table of Contents