117A
SAVE THESE INSTRUCTIONS
English
(117IO) CLEARVIEW PRISM FRAME™ PREMIUM POOL ENGLISH 7.5” X 10.3” PANTONE 295U 08/13/2020
Page 11
14
. Fold the liner horizontally in half
(see drawing 7.1)
. Insert one rolling pipe
(11)
between the folded
sections, then place the second rolling pipe on top of the folded liner
(see drawings 7.2 & 7.3)
. Make
sure the two rolling pipes cover the clear view panel and do not exceed the liner top edge.
15
. Begin rolling the liner from the end with the 2 rolling pipes to the other side gently
(see drawing 8.1)
.
Do not compact the liner. Make sure the clear view panel is facing up during storage.
16.
Fold the rolled up liner in half twice
(see drawings 8.2, 8.3 & 8.4)
.
17
. Store the liner and accessories in a dry, temperature controlled, between 32 degrees Fahrenheit
(0 degrees Celsius) and 104 degrees Fahrenheit (40 degrees Celsius), storage location.
18
. The original packing can be used for storage
(see drawings 9 & 10)
.
POOL MAINTENANCE & DRAINAGE
(
continued
)
7.1
8.1 8.2
8.4 9 10
8.3
7.2 7.3