254
PO
S AVE THESE INSTRUCTIONS
(254PO) SPA ENGLISH 7.5” X 10.3” PANTONE 295U 05/12/2017
English
Page 9
SET UP
(continued)
5.
Press the button to turn on the control unit panel
buttons fi rst. Press the button to infl ate the
spa tub wall for 8 to 10 minutes until it is fi rm to the touch
but not hard
(see drawing 6)
.
IMPORTANT:
Do not over infl ate or use high pressure air
compressor to infl ate.
6.
Press the button again to turn it off.
7.
Replace the air valve cap back.
NOTE:
The cap is designed to be screwed on and off. Never exert force as this could cause the
complete internal infl ation system of the valve to come loose. See “Spa Tub Air Valve Fastening” for
valve maintenance.
Infl ate the Spa Cover Air Bladder
1.
Open the infl ation valve and insert the infl ation hose
(7)
into the valve; press to infl ate until it is fi rm to the
touch but not hard
(see drawing 7)
.
2.
Disconnect the infl ation hose
(7)
from the air blower
infl ation outlet and the valve.
3.
Replace the control base infl ation cap
(5)
back; close and
recess the infl ation valve.
NOTE:
If there is a need to add some air to the spa tub wall or spa cover air bladder after they have been
setup, refer to above “Infl ate the Spa Tub Wall” and “Infl ate the Spa Cover Air Bladder” sections. The cover
air bladder is preinstalled inside the spa cover. If it needs to be reinstalled, place the uninfl ated air bladder
inside the spa cover lip before infl ating the bladder.
Defl ation
For Spa Tub Wall:
1.
Unscrew the cap to reveal the stem, push the stem in and
turn 90 degree right to secure it in the down position
(see
drawing 8)
.
2.
Once the defl ation is completed, push the stem in and turn
90 degree left to return it to the infl ation position.
3.
Replace the cap back.
For Cover Air Bladder:
1.
Pull valve cap out and squeeze the valve at its base until defl ated.
2.
Close and recess the valve back.
8
7
7
6