348
A
S AVE THESE INSTRUCTIONS
(348IO) SPA ENGLISH 7.5” X 10.3” PANTONE 295U 10/09/2019
English
Page 13
SET UP (continued)
Thespatubination/deationvalveincorporatesan“airpressurerelease”functionthatautomatically
releases excess air when the spa tub internal pressure is between 0.363 - 0.508 psi (0.025 - 0.035 bar).
Air pressure release valve.
Colder temperatures at night
cause the spa to seem less
inated.
Air expands in the midday
heat and correct air
pressure is restored.
Air expands in the midday heat.
Air pressure release valve kicks
in and releases excess air.
Inationofspainthemorning.
IMPORTANT
Inate the Spa Cover Air Bladder
1.
Opentheinationvalveandinserttheinationhose
(7)
into the
valve; press toinateuntilitisrmtothetouchbutnothard
(see drawing 7)
.
2.
Disconnecttheinationhose
(7)
fromtheairblowerinationoutlet
and the valve.
3.
Replacethecontrolbaseinationlatch back; close and recess the
inationvalve.
NOTE:
If there is a need to add some air to the spa tub wall or spa
coverairbladderaftertheyhavebeensetup,refertoabove“Inate
theSpaTubWall”and“InatetheSpaCoverAirBladder”sections.
The cover air bladder is preinstalled inside the spa cover. If it needs to
bereinstalled,placetheuninatedairbladderinsidethespacoverlipbeforeinatingthebladder.
Deation
For Spa Tub Wall:
1.
Unscrew the cap to reveal the stem, push the stem in and turn
90 degree right to secure it in the down position
(see drawing 8)
.
2.
Oncethedeationiscompleted,pushthesteminandturn90
degreelefttoreturnittotheinationposition.
3.
Replace the cap back.
NOTE:
Todeatethespatubforstorage,see“STORAGE”section.
For Cover Air Bladder:
1.
Pullvalvecapoutandsqueezethevalveatitsbaseuntildeated.
2.
Close and recess the valve back.
8
7
7