iMars grid-tied solar inverters Installation
19
Table 4-1 Detailed delivery list of three-phase inverter
4kW / 4kW-S / 5kW / 5kW-S /
6kW / 8kW / 10kW inverter
2 pairs / 1 pair(4kW-S、5kW-S)
4.2 Before installation
4.2.1 Installation tools
Table 4-2 Tools list
Mark the installation hole
Drill holes on the bracket or on the wall
Knock on the expansion bolt
Fix the installation bracket
Tighten the anti-theft screw and disassemble AC
junction box
“Slotted” or “cross-head”
screwdriver
Measure the insulation performance and grounding
impedance
Check the circuit and measure AC/DC voltage
Solder the communication cable
4.2.2 Installation site
Select installation site according to below requirements:
(1) The height of the installation position should ensure that the line of sight is on the same