EasyManua.ls Logo

ION 902 - Prepare for Operation (Plug N Play)

ION 902
24 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
www.naturalchoicewater.com ION 900 Series Owners Manual
Step 3: Prepare the ION for Operation (Plug N Play Setup)
When you plug in the ION, it automatically prepares for operation requiring
about five minutes to complete. During this time you may hear water flowing
inside the ION. This is normal.
NOTE: The ION will not dispense water from the faucet while it is preparing for
operation.
While the ION is preparing for operation, LEDs 1 and 2 are green and blinking.
During Plug N Play:
LEDs 1 and 2 are
green and blinking
For Model 901, please go to page 15.
For Model 902, 904, and 905, please go to page 14.
For Model 903, please go to page 16.
instaLLation (continued)
13

Related product manuals