EasyManua.ls Logo

IONIC Zero PPM - Machine Operation; Zero Operation Guide

Default Icon
54 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Machine Operation
22
Zero™ Operation (Vehicle Mounted Machines)
Pure Water Production
After suitable water and electric connections have been made, pure water production, filter
flushing and regeneration are all automatic functions of the machine. The following step-by-
step guide and explanation of the sequence of events are all that the operator needs to know
about the operation of the machine. For any servicing or repairs other than routine filter
replacement please refer to Ionic Systems Ltd or an approved agent of Ionic Systems Ltd.
Step 1
Connect a suitable water supply to the mains water ‘IN’ connection and ensure that the water
supply is fully open, please refer to page 25.
Step 2
Connect a suitable hose to the ‘Reject’ water
connection to run reject water to a suitable
drain.
1: Mains Water In
2: Reject Water Out
Step 3
Connect a suitable mains electric supply, please refer to page 18.
Step 4
Only after steps 1 through 4 have been completed, press the green ‘START’ button on
the control panel.