Installation Hotline • 866.EZINPRO
Inprocorp.com • 800.222.5556 • 262.679.9010
World Headquarters S80 W18766 Apollo Drive, Muskego, WI 53150 USA
Installation Instructions
2000/2000W/G2-2000 Handrail
Please read all instructions before installing
handrail.
SECTION VIEW
Safety Glasses, Tape Measure, 3/8” socket for machine screw hex bolt, 7/16” socket for wood screw
hex bolt Level, Power Drill, Drill Bits - 1/4” masonry (concrete/concrete block), Power Miter Saw, 1O”
Blade with 60-80 Carbide Tipped Teeth
Recommended tools
Important
1. Acclimate materials 24 hrs
before installation. Maintain
temperature controlled
environment after installation
2. Install in accordance with
manufacturer’s installation
instructions. Failure to do so
will void the warranty.
Installation tips
1. Cut covers up to 1/16” (1.6mm)
longer to ensure a tight t.
2. Lubricate blades when cutting
aluminum to reduce burrs.
IPC.335/REV.10
1 1/2"
[38mm]
2 1/4"
[57mm]
1 1/4"
[32mm]
3 3/4"
[95mm]
1/4" NUT AND
LOCK-WASHER
1/4 - 20 X 3"
HEX HEAD
SCREW W/
PHILLIPS
HEAD SLOT
STAINLESS
STEEL
MOUNTING
BRACKET
CONTINUOUS
ALUMINUM
RETAINER
.080"
[2mm]
VINYL
COVER
.080"
[2mm]
4 5/8"
[118mm]
CONVENTIONAL
STEEL STUD
(BY OTHERS)
HANDRAIL HEIGHT
PER LOCAL CODE
MOUNTING
BRACKET
1 1/2"
[38mm]
2 1/4"
[57mm]
VINYL COVER
.080"
CONTINUOUS
ALUMINUM
RETAINER
.080"
1/4 -20 x 5"
HEX HEAD
SCREW
W/PHILLIPS
HEAD SLOT
[25mm]
1 1/4"
[32mm]
3 3/4"
[95mm]
1 1/8" SLOTTED
PAN HEAD SCREW
W/SERRATED
FLANGE NUT
[2mm]
1"
[2mm]
2 13/16"
[72mm]
CONVENTIONAL
STEEL STUD
(BY OTHERS)
HANDRAIL HEIGHT
PER LOCAL CODE