11.7 POSITIONING - LEVELLING
ATTENTION
The equipment
is set-up with one-way pads for handling and positioning.
The equipment includes height adjustable feet for oor stability; after positioning, it is strictly necessary to manually
level the equipment on the oor
.
THE EQUIPMENT SHALL BE SEALED TO THE FLOOR
11.8 GRIDS (INSTALLATION)
ATTENTION
It is absolutely necessary to install the grids as indicated in order to prevent altering the correct air ow and thus avoid
higher product temperatures.
The gridss are adjustable in height.