3. PRIOR CHECKING AND START-UP
3.1.- PRIOR CHECKING
a) Is the machine leveled?
b) Voltage and frequency are the same as those on the nameplate?
c) Are the drains connected and operating?
d) Will the ambient temperature and water temperature remain in the following range?
In case inlet water pressure is higher than 0.6 MPa, install a pressure regulator.
3.2.- START-UP
Once the installation instructions are followed (ventilation, site conditions, temperatures, water
quality, etc.), proceed as follows:
1.- Open the water inlet. Verify the no existence of leakages.
2.- Open the door and remove the protection elements on the shield.
3.- Verify that the curtain moves freely.
4.- Connect the machine to the power supply.
5.- Push the switch on the machine front side.
6.- Verify that there are no vibrations or frictions on the elements.