31)The xing band in the P.W.B.assembly is cut. (4 parts)
32)The connectors in nine places are removed.
33)The Terminal board removed. (1 screw )
34)The plasmacluster assembly is removed. (2 screws)
35)The plasmacluster assembly is pulled forward, and detached.
36)Two hooks of the plasmacluster cover are removed by using (-)
screwdriver.
37)After the plasmacluster that removes the PC cover is taken out, the
wire connector is removed.
38)Six screws for the xation of the air lter cleaning mechanism
assembly is removed.
12PHR-N_S530612PHRN.indd 5 2013/8/7 15:42:22