Live components and equipment must be out of re-
ach of individuals in the spa.
For electrical connections, the installation of a multiple-pole
section switch is compulsory ( 3). It must be positioned in
a place that complies with safety regulations and, in any case,
which cannot be reached by those using the spa.
It is mandatory to comply with this instruction. Any other procedu-
re is prohibited.
The disconnection devices must be installed in the power
supply network according to the installation instructions.
The installation of electrical devices and equipment (sockets,
switches, etc.) near the spa must be in compliance with legal
standards and regulations in the country where the spa is in-
stalled.
For the equipotential connection as required by specic na-
tional standards, the installer must use the terminal provided
(standard EN 60335.2.60)in the electrical box ( 3), and mar-
ked with the symbol .
In particular, an equipotential condition must be established for
all metallic masses surrounding the spa, for example water and
gas pipes, metallic platforms, and so on.

Other manuals for Jacuzzi J-300

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Jacuzzi J-300 and is the answer not in the manual?

Jacuzzi J-300 Specifications

General IconGeneral
Shell MaterialAcrylic
Dimensions84" x 84" x 36"
Pumps2
Pump2 HP
Cabinet MaterialSynthetic
InsulationFull foam
Control SystemDigital
LightingLED
Warranty5 years

Related product manuals