EasyManua.ls Logo

jcb 8010 CTS - Tie down Points

jcb 8010 CTS
24 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6 Please see operator manual for full details.
Tie Down Points
Fig 2
REFER TO OPERATORS MANUAL TRANSPORTING MACHINE
1. Machines fitted with mechanical slew lock, engage slew lock. Ensure by operating the slew control
that the slew lock is engaged.
2. Close the bucket. Position the dipper vertically and lower the boom until the bucket rests on a
wooden block on the trailer bed.
3. Position a wire rope A of suitable breaking strain over the bucket and secure to the trailer shackles.
4. Place skids B under each track at front and rear to prevent movement of the machine in the fore
and aft direction.
5. Use nylon straps C of suitable breaking strain around each track at front and rear and secure to the
trailer shackles to prevent lateral movement of the machine.
6. Attach wire ropes D of suitable breaking strain to the kingpost and secure to the trailer shackles to
prevent the superstructure from slewing.

Related product manuals