EasyManua.ls Logo

jcb JS160 - Page 298

jcb JS160
533 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
34 - 8
Centre Bypass Valve (4 Spool Section)
Dismantling
1 Remove end cap 1.
2 Remove ‘O’-ring 2 and discard.
3 Remove piston 3.
4 Unscrew and remove sleeve 4.
5 Withdraw spool 5.
6 Encase spool in holder and clamp into a vice.
Note: See page 34 - 4 for details of holder.
7 Slacken and remove locknuts 6, spring seating washers
7 and spring 8.
Cleaning, Inspection
1 Clean all parts with clean oil and dry with compressed
air. Inspect all parts.
2 Ensure spool 5 and piston 3 move smoothly.
3 Check spring 8 has no defects, deformation or wear.
4 Remove slight defects by lapping.
5 Renew damaged or badly worn parts.
Assembly
Assembly is the reverse of the dismantling procedure.
Torque Settings
1 60 Nm (44 lbf ft)
4 60 Nm (44 lbf ft)
6 25 Nm (18 lbf ft)
Section E Hydraulics
9803/6410
Section E
34 - 8
Issue 1
Control Valve
JS01050
JS01060
JS01070

Table of Contents

Related product manuals