EasyManua.ls Logo

jcb JS160 - Page 315

jcb JS160
533 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
34 - 25
Diverter Valve
Dismantling
1 Remove cover plug 1.
2 Remove ‘O’-ring 2 and discard.
3 Using a steel rod X with one end threaded M5 x 0.8,
screw into sleeve 3 and withdraw from control valve
body.
4 Remove ‘O’-ring 4 and discard.
Cleaning, Inspection
1 Clean all parts with clean oil and dry with compressed
air. Inspect all parts.
2 Ensure sleeve 3 moves smoothly.
3 Remove slight defects by lapping.
4 Renew damaged or badly worn parts.
Assembly
Assembly is the reverse of the dismantling procedure.
Torque Settings
1 29.8 Nm (22 lbf ft)
Section E Hydraulics
9803/6410
Section E
34 - 25
Issue 1
Control Valve
JS01450

Table of Contents

Related product manuals