EasyManua.ls Logo

JDS Uniphase HST-3000 - Page 14

JDS Uniphase HST-3000
24 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Page 14 of 24
12. Check LED Results Press the Right Arrow key until LED Results are displayed. A Green
Signal Present LED indicates that the HST-3000 is receiving an optical
signal from the near end Ethernet Switch. Green Sync Acquired and
Link Active LEDs indicate that the HST-3000 has successfully
connected to the near end Ethernet switch and the Ethernet link is active.
13. Check ARP Status If you are running a Layer 3 IPv4 Test, verify that the final message in
the Message bar is “ARP Successful
If “ARP Successful is not displayed, verify that the HST-3000’s IP
menu is configured correctly, as outlined above.
14. Test Inform the A-side technician that you are ready for test.
Technical Support tac@jdsu.com 855-275-5378

Other manuals for JDS Uniphase HST-3000

Related product manuals