EasyManua.ls Logo

Jeep 2002 WJ - 1 2;4-5 Shift Solenoid; 17 - 1-2;4-5 Command Valve; 2 2;4-5 Overlap Valve; 4 2;4-5 Holding Pressure Shift Valve

Jeep 2002 WJ
291 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Activation Sequence
The selector valve (Fig. 20) opens the shift pres-
sure (p-S) feed connection from the ball valve (19)
with the shift valve B2 (9). With the shift valve B2
(9) in the upper position, shift pressure (p-S) travels
behind the piston B2 (5) and simultaneously to the
opposing face of the piston B2 (6). The multiple-disc
holding clutch B2 begins to close.
The pressure on the opposing face of the piston B2
(6) ensures a soft activation of the multiple-disc hold-
ing clutch B2.
Fig. 19 Engine Started
1 - HOLDING CLUTCH B1 11 - PRESSURE HOLDING VALVE
2 - DRIVING CLUTCH K1 12 - 3-4 HOLDING PRESSURE SHIFT VALVE
3 - HOLDING CLUTCH B3 13 - 3-4 COMMAND VALVE
4 - DRIVING CLUTCH K3 14 - 3-4 SHIFT PRESSURE SHIFT VALVE
5 - HOLDING CLUTCH B2 PISTON 15 - 3-4 OVERLAP REGULATING VALVE
6 - HOLDING CLUTCH B2 PISTON OPPOSING FACE 16 - BALL VALVE
7 - SHIFT PRESSURE REGULATING SOLENOID 17 - 1-2/4-5 COMMAND VALVE
8 - SHIFT PRESSURE REGULATING VALVE 18 - 1-2/4-5 COMMAND VALVE
9 - SHIFT VALVE B2 19 - BALL VALVE
10 - 3-4 SHIFT SOLENOID
21a - 22 TRANSMISSION AND TRANSFER CASE WG
AUTOMATIC TRANSMISSION - W5J400 (Continued)

Table of Contents

Related product manuals