EasyManua.ls Logo

Jeep 2002 WJ - Page 230

Jeep 2002 WJ
291 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ASSEMBLY
(1) Install piston (2) (Fig. 126) in outer multiple-
disc carrier (1). Press in piston using the disc spring
(3) and Multi-use Spring Compressor 8900 (8). Place
compressor (8) on disc spring (3) and compress until
the groove of the snap-ring is exposed
NOTE: Check vulcanized gasket, replace if neces-
sary.
(2) Insert snap-ring (4) (Fig. 126).
NOTE: The collar of the snap-ring must point
towards the multiple-disc pack. After installing,
check snap-ring for correct seat.
(3) Insert disc spring (5) and multiple-disc pack (6)
in the outer multiple-disc carrier.
(4) Insert snap-ring (7).
NOTE: Pay attention to sequence of discs. Place
new friction multiple-discs in ATF fluid for one hour
before installing.
Fig. 126 Holding Clutch B1
1 - HOLDING CLUTCH B1 OUTER CARRIER 5 - DISC SPRING
2 - PISTON 6 - MULTIPLE DISC PACK
3 - DISC SPRING 7 - SNAP-RING
4 - SNAP-RING 8 - MULTI-USE SPRING COMPRESSOR 8900
WG TRANSMISSION AND TRANSFER CASE 21a - 89
HOLDING CLUTCH B1 (Continued)

Table of Contents

Related product manuals