EasyManua.ls Logo

Jet JMD-18 - Preparation and Setup; Shipping Container Contents; Unpacking and Tools

Jet JMD-18
36 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Contents of the Shipping Container
1 Mill/Drill
Accessory Package:
1
1
1
1
2
Chuck Arbor (installed)
1/2" Drill Chuck w/ Chuck Key
Adjustable Carbide Facemill
Facemill Arbor
Bolts, Nuts, and Washers to
Attach Vise to Table
2-1/2" Angle Vise (JMD-15)
3-1/2" Angle Vise (JMD-18/18PFN)
Handle Rods
Plastic Knobs
3/8"x1" Hex Socket Cap Screw
3/8" Washer
Crank Body
Crank Handle
3mm Hex Wrench
5mm Hex Wrench
23mm Hex Socket Wrench (JMD-18/18PFN)
Hand Wheels w/ Handles
Can Touch-Up Paint
Operator's Manual
Warranty Card
1
1
3
3
1
1
1
1
1
1
1
3
1
1
1
Unpacking and Clean-up
1. Finish removing the crate from the mill/drill.
Unbolt the machine from the crate bottom.
Report shipping damage, if any, to your
distributor.
2. Remove any protective coating with kerosene or
a mild solvent. Do not use gasoline, paint
thinner, or lacquer thinner. These will damage
painted surfaces.
Tools Needed for Assembly
8" Adjustable Wrench or 1/4" to 1-1/4" Combination
Wrench Set
4

Related product manuals