12 JLA Limited 113372-16
NOTE: Allowances must be made for the opening of the control door.
Dryers may be positioned sidewall to sidewall. However, a 1/16” (1.5875 mm) minimum allowance must be
made for the opening and closing of the control door. It is suggested that the dryer be positioned about 2 feet
(0.61 meters) away from the nearest obstruction for ease of installation, maintenance, and service (to be measured
from the back guard). Refer to the illustration above for details.
IMPORTANT: Even though a minimum of only 12-inches (30.48 cm) is required, 24-inches (60.96
cm) or more is suggested. The additional clearance is advantageous for ease of
installation and service.
IMPORTANT: When fire sprinkler systems are located above the dryers, a minimum of 18-inches
(45.72 cm) above the dryer console (module) is required. Dryers may be positioned
sidewall to sidewall however, a 1/16” (1.5875 mm) minimum allowance is required
between dryers (or wall) for ease of installation and maintenance.
C. DRYER ENCLOSURE REQUIREMENTS
Bulkheads and partitions should be made of noncombustible materials and must be located a minimum of
12-inches (30.48 cm) above the dryers outer top, 18-inches (45.72 cm) or more is recommended for ease of
installation, maintenance, and service, except along the front of the dryer, which may be partially closed in if
desired. The clearance between the bulkhead header and the dryer must be a minimum of 4-inches (10.16 cm)
and must not extend more than 4-inches (10.16 cm) to the rear. The bulkhead facing must not be closed in
ALL the way to the top of the dryer. A 1-inch (2.54 cm) clearance is required.