EasyManua.ls Logo

JLG EC520AJ - Page 33

JLG EC520AJ
118 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
User Responsibilities, Machine Preparation, and Inspection
EC450AJ, EC520AJ
31219187
33
Note:
If the Platform/Ground Select switch is in the Platform position, it will take approximately 10 seconds for
the Control System power to be shut down.
5. If the power shuts down properly, turn the Battery Dis-
connect Switch back to the On position. Look at the dis-
play to verify the power has been turned back on and
resume the Function Check. If the power did not shut
down or turn on properly, Report the problem to the prop-
er maintenance personnel. Do not operate the machine
until it is declared safe for operation.

Table of Contents