9
12 Thread the Dyneema cord coming from the rear end of the JibBoom through the first two eyes of a Bowsie, then up through the 6mm
ring at the lower end of the Topping Lift and back through the final hole in the Bowsie. With the Bowsie positioned approximately 40mm
below the ring, tie off the cord and trim off the loose end. Adjust the Bowsie to take out the tension in the back edge (Leech) of the sail,
allowing it to twist open slightly when filled with wind.
At this stage you have completed the rigging, the next sections will cover the fitting of ‘Sheets’ (control lines) to the Booms and setting the
rig up for best performance and boat trim.
5
6
5
6
7
8 9
11 12