2.Installation of Scanner Unit > 2.1 Equipment Cable 
 
2-7 
 
2.1.4   Cable end processing method 
Allow for sufficient cable length so that maintenance, inspection, and repair work can be easily executed.   
Ensure a place to store the cable. 
1)  CFQ-6912 
Cut off the metal shell connector. 
 
CFQ-6912 Cutting position 
 
Remove about one meter of the outer skin, and then process the double braided shield according to the 
procedures shown below. 
 
CFQ-6912 Processing of braided shield 
 
Process each cable end according to the procedures shown below. 
    CFQ-6912 
End processing of each wire