11.14 EN
208
Clamping device
Air conditioning system
Crane hook
Load backrest
Hydraulic operations W A B C
1 Test the acknowledgement key. t
2 Test the hose reel and check for leaks and damage. t
3 Check axial play of the front and rear rollers and adjust if necessary. t
4
Check attachment is properly secured to the truck and the
supporting elements.
t
5 Test attachment, check settings and check for damage. t
6 Check sliding blocks are complete. t
7
Check attachment bearing points, guides and stops for wear and
damage, grease and clean these components.
t
8 Check attachment lubrication; clean and lubricate if necessary. t
9 Check hydraulic ports and tighten if necessary. t
10 Check cylinder seals. t
11 Check cylinder piston rods and bushings. t
Chassis and Superstructure W A B C
1
Test air conditioning system and its settings and check its
components for damage.
t
2
Note: The air conditioning system must only be serviced every two
years or 2000 service hours by specialist personnel.
3 Visually inspect the filter and replace if necessary. t
4
Check temperature reading at the outlet of the ventilation nozzles
against manufacturer's ratings.
t
Hydraulic operations W A B C
1
Check attachment is properly secured to the truck and the
supporting elements.
t
Hydraulic operations W A B C
1
Check attachment is properly secured to the truck and the
supporting elements.
t